You can keep installing the tiles working from the center towards the walls. You can install them removing the back paper to expose the sticky part of the tiles. Take the vinyl tiles and place them in the center of the room where the lines bisect. Make sure that the concrete surface is clean and will adhere to the tile. You do the same thing with all four walls until you draw two bisecting lines that divide the room in quarters. Draw a line towards the center of the room. Measure the room and mark the center of each wall in the room using the chalk. If the number shown from the test is not high, you can start with your project and lay the tiles directly on the concrete floor. If the levels are too high, you will need to de-moisturize the floor before installing the tiles. This test checks the amount of moisture and water that comes up from the concrete base. You should have the results within 18-24 hours. You must follow the instructions on the test. Taking precautions is absolutely necessary the most reliable test you can run is the calcium chloride test which is easy to find at any local store. One of the first things you need to do after you clean the concrete floor is to test it if you don’t do so, you might find out a few months later that the adhesive gets loose because the floor is very moist and unsafe. Make sure that the concrete base is clean and does not have any cracks or remains from older flooring. If the scraper doesn’t do the job properly, you can use the alcohol to remove any stains. Once you are done you should sweep the remains and throw them away. Use the scraper to remove any glued materials or adhesive remaining on the floor. Preparation is the most important part of any installation process.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |